Summer 2021 saw us take on an ambitious transformation of a property that had a recently had a substantial extension. Involved was the installation of a completely new heating system, encompassing underfloor heating, a complete re-piping of the heating system, two bathroom suite installations, guttering and down pipe installation. We also took care of the water supply diversion. Working across a number of weeks, liaising with multiple other contractors working onsite at the time, we brought the project in on-budget and on-time.

The client was delighted with the result, especially the stunning bathroom suite which required intricate tiling to ensure a premium finish. We have detailed a step by step guide to the works below from beginning to end. If you are currently planning building work or have a tired bathroom in need of transformation, call us today and we will ensure you receive a quotation within 5 working days. We look forward to hearing from you soon.

  • See what we achieved

    • Turned off the cold water supply to the property
    • Drained the cold, hot and heating system
    • Stripped out all pipework and white goods including bathroom, downstairs WC, kitchen sink and central heating system
    • Diverted the cold water supply from under stairs cupboard to the new plant room
    • Installed under floor heating over the whole ground floor and the new extension area on the first floor. The ground floor installation was a standard installation with a screed floor but the first floor was installed using the Nu-Heat LoPro Lite system.
    • First fix of the pipework for the heating system primaries, three circuits in total, the ground floor under floor heating, the first floor underfloor heating and the radiator circuit for the original bedrooms
    • First fix the cold and hot pipework to feed the kitchen sink and appliances, utility room, family bathroom, en-suite bathroom and downstairs cloakroom
    • Pressure tested all the pipework before boarding and skimming
    • Installed new waste/drainage pipework both internal and external and re-routed the underground drainage pipework as the exiting would be under the new extension
    • Fitted new guttering and downpipes around the full building
    • Tiled the floor and sections of walls around the walk in shower and the bath in the family bathroom
    • Second fixed the family bathroom including a cast iron roll top bath, basin & vanity unit, toilet and the shower valve and screen
    • Once the kitchen had been fitted, a Quooker tap was fitted and all the fittings were installed in the unit under the sink, a water supply was taken to the fridge freezer. Fitted the kitchen sink and pipework in the utility room and connected the washing machine
    • Installed a Worcester Bosch systems boiler and unvented cylinder and all the pipework in the plant room
    • Tiled the shower area and the floor and second fixed the en-suite bathroom including a large double ended walk in shower with screen, double basin vanity unit and a toilet
    • Fitted the toilet and small wall hung basin in the downstairs cloakroom
    • Commissioned and tested the whole installation.
  • Client
    Private/Domestic

  • Location
    Scarborough

  • Services
    Heating system replacement, pipework, guttering, tiling, appliance installation, testing

Contact us today regarding your project- we can get it done.

Please feel free to contact us using the form below or via email- contact@murphyutilities.co.uk. We will always come back to you within 2 working days.

  • Based in Yorkshire
  • Proven track record
  • Team of 70+
Logo

Registered Address: Units 3B & 3C, Burniston Industrial Estate, Willymath Close, Scarborough, YO13 0GH

Company Number: 07647081

Privacy Policy